Post-Construction Cleaning in Chicago

Plan cleaning around the remaining trades and your handover date. We’ll assess the site during a walkthrough before quoting the work.

Request a project walkthrough
Workers, equipment, and structural materials at a construction site

Which stage is the site ready for?

The site’s condition determines the cleaning needed. These stages are assessed separately.

  1. Rough clean

    assess the condition and initial cleaning needs

  2. Final clean

    agree on detailed work before handover

  3. Touch-up

    discuss cleaning after final trades or inspections

Check site readiness

Let us know whether trades are still working, utilities are available, and new finishes have care instructions. Access and safe working conditions need to be confirmed before scheduling.

Separate cleaning from other site work

Waste hauling, heavy debris removal, hazardous-material handling, remediation, and specialist restoration are not assumed to be included. Flag these needs before the assessment.

Work back from the handover date

Bring the handover deadline, site checklist, and remaining trades schedule to the walkthrough. We’ll confirm the cleaning work, price, and availability before scheduling. No recurring plan is required.