Which stage is the site ready for?
The site’s condition determines the cleaning needed. These stages are assessed separately.
Rough clean
assess the condition and initial cleaning needs
Final clean
agree on detailed work before handover
Touch-up
discuss cleaning after final trades or inspections
Check site readiness
Let us know whether trades are still working, utilities are available, and new finishes have care instructions. Access and safe working conditions need to be confirmed before scheduling.
Separate cleaning from other site work
Waste hauling, heavy debris removal, hazardous-material handling, remediation, and specialist restoration are not assumed to be included. Flag these needs before the assessment.
Work back from the handover date
Bring the handover deadline, site checklist, and remaining trades schedule to the walkthrough. We’ll confirm the cleaning work, price, and availability before scheduling. No recurring plan is required.